Tofaş - Success Story
Within Tofaş, a project was designed by the relevant team in order to gain efficiency in logistics in 2012. In order for this project to be implemented, an application had to be developed both by Tofaş and its suppliers. At this point, in this project, which we have undertaken as BİTEG Software, we brought the production order of Tofaş body parts to the supplier and ensured that they could be glazed on time.
Growing in time, we have passed the project to the second phase with the demand to include not only JIS but also JIT parts in the system. With this project called JITGOV, both JIS and JIT parts are fed to the line with zero warehousing. After the publication of the Tofaş production order, the checkout lists are optimized on a common platform and a dispatch plan is presented to the supplier.
With this project, certain parts of which are still being developed, significant gains are achieved both on the side of Tofaş and its suppliers. In this respect, the Tofaş JITGOV project sets an example for advanced applications in the context of lean production and industry 4.0.